Solar Engineering
How to Estimate Rooftop Solar Capacity
One of the most common mistakes in commercial and residential rooftop solar is sizing a plant based solely on "how many panels fit on the roof." In reality, a technically sound rooftop solar capacity is governed by the minimum of three independent constraints: energy demand, shadow-free roof area, and utility/sanctioned load limits.
Constraint 1: Annual Electricity Consumption
In most parts of Maharashtra and western/central India, a well-designed rooftop PV plant typically generates roughly 1,350 to 1,550 kWh per kWp per year (varying by location, tilt, shading, and module technology). Using an indicative specific yield of 1,450 kWh/kWp/year:
For example, a commercial facility consuming 145,000 kWh per year would require approximately 100 kWp to offset 100% of its annual energy usage—subject to net-metering banking rules and daytime self-consumption patterns.
Constraint 2: Shadow-Free Usable Roof Area
High-efficiency modern modules (540 Wp to 600+ Wp Mono-PERC or N-type TOPCon) require less area per kWp than older 330 Wp panels, but practical engineering requires maintenance walkways, edge setbacks for wind uplift, and inter-row spacing to avoid self-shading:
- RCC Flat Roof (tilted structures): Typically 80 to 100 sq. ft. per kWp of shadow-free area.
- Metal / Industrial Sheet Roof (flush-mounted): Typically 60 to 80 sq. ft. per kWp, depending on roof orientation and skylight obstructions.
Constraint 3: Sanctioned Load & Transformer Capacity
Under state net-metering regulations, rooftop solar capacity is commonly capped at the consumer's Sanctioned Load / Contract Demand (and subject to Distribution Transformer capacity ceilings for LT consumers). If your sanctioned load is 50 kW, installing 80 kWp under net metering will typically require a formal load enhancement or a gross/captive evaluation.